Splunk SOAR (f.k.a. Phantom)

Synchronization error while running a single playbook on different events at same time

ansusabu
Communicator

I have a usecase configured in Splunk and we are getting multiple events in phantom at the same time.
When I try to run a playbook, only one event runs an action block and the rest of the events through 'synchronization' error.

Do we have any other way?

Labels (1)
0 Karma
Get Updates on the Splunk Community!

Introducing Splunk Enterprise 9.2

WATCH HERE! Watch this Tech Talk to learn about the latest features and enhancements shipped in the new Splunk ...

Adoption of RUM and APM at Splunk

    Unleash the power of Splunk Observability   Watch Now In this can't miss Tech Talk! The Splunk Growth ...

Routing logs with Splunk OTel Collector for Kubernetes

The Splunk Distribution of the OpenTelemetry (OTel) Collector is a product that provides a way to ingest ...